Unleash™ PVC Long Line | Training Lead for Dogs - Waterproof, Durable, Lockable Clasps, Strong Long Leads for Dog Training,
$56.18
Posted 08 June 2023 9:35:26 am
Pet supplies
May be eligible for free delivery as this product is over $39 or for Amazon Prime members, without minimum spend.
First 30 days FREE Amazon Prime for new sign-ups.
Deal history
This deal is seen for the first time from this store.
Price history
Description
Unleash – Long Line Dog Lead. The best choice for your four legged friends (and their owners...)
STRONG, DURABLE & LIGHTWEIGHT
The Unleash Dog training lead is very strong & durable whilst remaining lightweight and easily portable.
HIGH QUALITY TRAINING LEAD FOR DOGS
Our dog training leash will take you and your dog anywhere. The strength quality of the PVC Biothane means any training is safe for your dogs and our new improved strong locking clip will hold for dogs up to 60kg!
FEATURES:
- State of the art PVC material
- Waterproof & easy to wipe clean
- Strong & flexible
- Lightweight & easy to hold
- Bright and easy to see
- Perfect training tool
- Safe and Secure
- Cutting edge 360 locking clip. Security & freedom of movement
SECURE & FLEXIBLE
Reinforced stitching & 360 rotating locking clip make this long line flexible and 100% safe & secure.
WATERPROOF
Waterproof dog training lead is usable in any conditions. This long dog lead is 100% stink proof and will not get heavy or muddy.
TEMPERATURE RESISTANT
UNLEASH long leads for dog training can withstand both low and high temperatures. These long recall leashes for puppies will work in cold and hot weather.
BRIGHT & EASY TO SEE
Bright fluorescent orange is easy to see in low-light and forest. No need to worry about your dog getting lost or tangled.
DIRT RESISTANT & EASY TO CLEAN
Easily remove dirt. Simply wipe down before storing. No smell dog lead. SAFE, SECURE, NO SMELL, NO MESS
Share this deal
Tags
Unleash™ | PVC | Long | Line | Training | Lead | for | Dogs | Waterproof | Durable | Lockable | Clasps | Strong | Long | Leads | for | Dog | Training
Unleash™ PVC | Unleash™ PVC Long | Unleash™ PVC Long Line
PVC Long | PVC Long Line
Long Line | Long Line | Training
Line | Training | Line | Training Lead
When you click on a link or place an order, RewardBargain may receive a commission, however, this does not influence in any way the decision to publish deals.
No comments yet, be the first to add one.
Post a new comment as anonymous, or sign-in to your account: